Home » Renewable Energy » ARRAY Opens a $50 Million Solar Tracker Plant in Albuquerque

ARRAY Opens a $50 Million Solar Tracker Plant in Albuquerque

ARRAY Technologies opened a 216,000 square foot Albuquerque factory on Sept. 9, 2026. The company says it will employ about 300 people and bring some outsourced parts in-house.

Workers installing solar panels, representing Albuquerque solar manufacturing jobs powering affordable clean energy

On September 9, 2026, ARRAY Technologies cut the ribbon on a new manufacturing facility in Albuquerque, New Mexico. The company makes solar trackers, the motorized racking that tilts panels to follow the sun. It says the plant covers 216,000 square feet, about three times the size of its previous Albuquerque site, and cost more than $50 million. ARRAY also sells fixed-tilt products, foundations, software, and services, but its release does not say which of these the new site produces. It says only that the plant brings in-house production of components the company previously bought from outside suppliers.

That vagueness runs through the announcement. The release gives no production capacity and no list of products. The company’s figure of more than 100 GW of tracker deployments worldwide describes its history, not this plant.

The jobs

ARRAY says the plant will hold approximately 300 positions across production, assembly, design, engineering, and customer service. Roles mentioned include stamping press operators, tooling and die technicians, and process engineers. The release gives no hiring timeline, so the 300 jobs are a target, not a count of people on the payroll.

Sen. Martin Heinrich said the facility will employ “more than 300 New Mexicans,” a slightly different number from the company’s.

Who put up the money

ARRAY reports a $50 million-plus investment. Public support is smaller but real. New Mexico’s Local Economic Development Act (LEDA) job-creation fund provided $2.5 million. The City of Albuquerque and Bernalillo County each added $250,000 in LEDA funding. The project also gets a partial property-tax abatement through an Industrial Revenue Bond.

ARRAY says several components made at the plant qualify for the federal Section 45X Advanced Manufacturing Production Tax Credit. The company’s own release warns that changes to that credit could affect its plans.

Item Reported figure Source
Size 216,000 sq ft ARRAY release
Investment More than $50 million ARRAY release
Jobs About 300, no timeline given ARRAY release
State LEDA funding $2.5 million ARRAY release
City and county LEDA funding $250,000 each ARRAY release

Why It Matters to You

The clearest benefit goes to people in the Albuquerque area, where the plant is meant to employ about 300 people once hiring happens. For solar buyers the effect is small and indirect: ARRAY makes trackers, not panels, and the release makes no claim about lower prices. The plant has opened, but no source says how many people are hired today.

What to keep in mind

  1. The 300 jobs are the company’s target. Neither the release nor Solar Power World says how many people are hired today or by when.
  2. The plant makes trackers, not solar panels, so nothing here points to cheaper panels.
  3. No source gives a production capacity or a per-unit cost saving for this plant.
  4. Section 45X credit eligibility is a company statement, and changes to the credit could affect its plans.
  5. A tracker is one part of a solar project, so any effect on a homeowner’s quote would be small and indirect.

Quick answers

Will this make solar panels cheaper?

Not directly. ARRAY does not make panels. Trackers are used mainly in utility-scale solar farms, and the sources give no estimate of price effects.

How many jobs will it create?

ARRAY says about 300. Sen. Heinrich said more than 300. No hiring schedule has been published.

Sources

Related Reading